Jump to content

Kattupakkam metro station

Coordinates: 13°02′33″N 80°07′28″E / 13.04241°N 80.12456°E / 13.04241; 80.12456
From Wikipedia, the free encyclopedia

Kattupakkam
Chennai Metro station
General information
Coordinates13°02′33″N 80°07′28″E / 13.04241°N 80.12456°E / 13.04241; 80.12456
Owned byChennai Metro Rail Limited (CMRL)
Operated byChennai Metro
Line(s)Yellow Line
PlatformsIsland platform
Platform-1 → Lighthouse
Platform-2 → Poonamallee Bypass
Tracks2
Construction
Structure typeElevated, Double track
Platform levels2
AccessibleYes Disabled access
Other information
StatusUnder Construction
History
OpeningDecember 2025; 5 months' time (December 2025) (TBC)
ElectrifiedSingle phase 25 kV, 35 Hz AC through overhead catenary
Services
Preceding station Logo of Chennai Metro Chennai Metro Following station
Kumananchavadi Yellow Line
(Under Construction)
Iyyapanthangal
towards Lighthouse
Kumananchavadi Yellow Line
(Future Service)
Location
Map

Kattupakkam is an upcoming elevated metro station on the East-West Corridor of the Yellow Line of Chennai Metro in Chennai, India. This metro station will be among the 30 stations of Corridor IV and 18 elevated stations along Corridor IV of the Chennai Metro, Poonamallee Bypass–Lighthouse stretch. This metro station is slated to be commercialized on December 2025.

History

[edit]

In January 2021, Chennai Metro Rail Limited (CMRL) began the bidding process for the construction of this Kattupakkam metro station, that spans between Poonamallee Bypass and Porur Junction, a 7.945 km segment forming Corridor 4 within Phase 2 of the Chennai Metro project.

The contract, designated as Package C4-ECV-02, drew prominent interest from a number of prominent infrastructure firms, including Larsen & Toubro (L&T), Tata Projects, Afcons Infrastructure, and lastly with ITD Cementation India Ltd. Following a quite thorough evaluation of all of the technical submissions along with financial bids, Larsen & Toubro (L&T) was declared the lowest bidder, with its proposal meeting both engineering requirements along with cost parameters set by CMRL. Subsequently, the contract was awarded in full to them.

The construction of the station began in 2021. The construction is being funded by Asian Infrastructure Investment Bank.[1] Following the award, they initiated work in line with the project's approved blueprint and execution plan. [2][3]

Station layout

[edit]

Station Layout - To Be Confirmed

Kattupakkam track layout
P#
P#
Station with two tracks and one Island platform
** Under Construction
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Ticket/token, shops
L2 Platform #
Eastbound
Towards → Lighthouse
Next Station: Iyyapanthangal
Island platform | Doors will open on the right Disabled access
Platform #
Westbound
Towards ← Poonamallee Bypass **
Next Station: Kumananchavadi
L2 Note: ** (Further extension to Parandur Airport in the future)

Entry/Exit

[edit]

See also

[edit]

References

[edit]
  1. ^ "Kodambakkam to Poonamalee Chennai Metro stretch to be operational by June 2024". The New Indian Express. Chennai: Express Publications. 13 August 2021. Retrieved 30 December 2021.
  2. ^ "L&T Wins Chennai Metro Line-4's Porur – Poonamallee Section". The Metro Rail Guy. 22 January 2021. Retrieved 7 April 2025.
  3. ^ "Chennai Metro Phase 2 – Information, Route Maps, Tenders & Updates". The Metro Rail Guy. Retrieved 7 April 2025.
[edit]