Jump to content

Porur Junction metro station

Coordinates: 13°02′09″N 80°09′25″E / 13.03587°N 80.15683°E / 13.03587; 80.15683
From Wikipedia, the free encyclopedia
(Redirected from Porur metro station)


Porur Junction
Chennai Metro station
General information
Coordinates13°02′09″N 80°09′25″E / 13.03587°N 80.15683°E / 13.03587; 80.15683
Owned byChennai Metro Rail Limited (CMRL)
Operated byChennai Metro
Line(s)Yellow Line
PlatformsSide platform
Platform-1 → Lighthouse
Platform-2 → Poonamallee Bypass
Tracks2
Construction
Structure typeElevated, Double track
Platform levels2
AccessibleYes Disabled access
Other information
StatusUnder Construction
History
OpeningDecember 2025; 4 months' time (December 2025)
ElectrifiedSingle phase 25 kV, 35 Hz AC through overhead catenary
Services
Preceding station Logo of Chennai Metro Chennai Metro Following station
Porur Bypass Yellow Line
(Under Construction)
Alapakkam
towards Lighthouse
Porur Bypass Yellow Line
(Future Service)
Location
Map

Porur Junction metro station is an upcoming elevated metro station on the East-West Corridor of the Yellow Line of Chennai Metro in Chennai, India. This metro station will be among the 30 elevated stations of Corridor IV and 12 underground stations along Corridor IV of the Chennai Metro, Poonamallee BypassLighthouse stretch. This station is slated to be commercialized on December 2025.[1][2]

History

[edit]

In 2020, Larsen & Toubro (L&T) was awarded the contract for construction of stations from Porur Junction to Kodambakkam Powerhouse with the construction commencing from then.[3] As MGR flyover passes close to this station, steel beams were placed above to connect to Poonamallee.[4] The work on Porur station was almost completed in March 2025 alongwith the next set of stations from Porur Bypass to Poonamallee Bypass[5] and set for opening by end of 2025.[1]

Station layout

[edit]

Station Layout

Porur Junction track layout (TBC)
to Alapakkam **
P#
P#
Station with two tracks and two side platforms
** Under Construction
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform #
Eastbound
Towards → Lighthouse
Next Station: Alapakkam
Platform #
Westbound
Towards ← Poonamallee Bypass **
Next Station: Porur Bypass
Side platform | Doors will open on the left Disabled access
L2 Note: ** (Further extension to Parandur Airport in the future)

Entry/Exit

[edit]

See also

[edit]

References

[edit]
  1. ^ a b "Poonamallee to Porur metro stretch to be inaugurated by December". The New Indian Express. 14 February 2025. Retrieved 14 April 2025.
  2. ^ "Chennai Metro Phase 2 – Information, Route Maps, Tenders & Updates". The Metro Rail Guy. Retrieved 7 April 2025.
  3. ^ "L&T gets first contract for Chennai Metro phase II". The Hindu. 9 December 2020. Retrieved 14 April 2025.
  4. ^ "CMRL corridor 4: Steel portal beams erected in Porur". DT Next. 3 August 2024. Retrieved 14 April 2025.
  5. ^ "Chennai Metro Rail Limited completes viaduct between Poonamallee and Porur". The Hindu. 9 March 2025. Retrieved 14 April 2025.
[edit]