Shixi station
![]() Platform | |||||||||||||
Chinese name | |||||||||||||
Simplified Chinese | 石溪站 | ||||||||||||
Traditional Chinese | 石溪站 | ||||||||||||
| |||||||||||||
General information | |||||||||||||
Location | West side of the intersection of Gongye Avenue South (工業大道南) and Xingye Road (新業路) Ruibao Subdistrict , Haizhu District, Guangzhou, Guangdong China | ||||||||||||
Coordinates | 23°4′21″N 113°16′57″E / 23.07250°N 113.28250°E | ||||||||||||
Operated by | Guangzhou Metro Co. Ltd. | ||||||||||||
Line(s) | Guangfo line | ||||||||||||
Platforms | 2 (1 island platform) | ||||||||||||
Tracks | 2 | ||||||||||||
Construction | |||||||||||||
Structure type | Underground | ||||||||||||
Accessible | Yes | ||||||||||||
Other information | |||||||||||||
Station code | GF23 | ||||||||||||
History | |||||||||||||
Opened | 28 December 2018 | ||||||||||||
Services | |||||||||||||
|
Shixi Station (Chinese: 石溪站; pinyin: Shíxī Zhàn; Cantonese Yale: Sehkkāi Jaahm) is a station on the Guangfo Line of the Guangzhou Metro.[1] It is located under Gongye Avenue South (Chinese: 工业大道南) at the intersection with Xingye Road (新業路) near Xinyuying Petrol Station (Chinese: 新裕英加油站) in Haizhu District, Guangzhou, China. It started operations on 28 December 2018.
The station is located about 200 meters away from Gongye Avenue South station on Guangzhou Metro Line 10, but the two stations are not official interchange stations. Interchange between these stations will be treated as two separate journeys requiring two fares.
Station layout
[edit]The station is a two-storey underground station. The ground level is the exit, and it is surrounded by Gongye Avenue South, Xingye Road, Yongcui Road, Jinbi Garden Lingcui Garden, other residential areas and other nearby buildings. The first floor is the concourse, and the second floor is the platform for Guangfo line.
G | - | Exits A, B, D |
L1 Concourse |
Lobby | Ticket Machines, Customer Service, Shops, Police Station, Security Screening Facilities |
L2 Platforms |
Platform 2 | ![]() |
Island platform, doors will open on the left | ||
Platform 1 | Guangfo towards Lijiao (Nanzhou) ![]() |
Concourse
[edit]There are automatic ticket machines and an intelligent customer service center at the concourse. There are elevators, escalators, and stairs in the fare-paid area for passengers to reach the platform.
-
Concourse
Platform
[edit]The station has an island platform located under Gongye Avenue South. The restrooms and baby change are located at the end of the platform towards Lijiao.

Exits
[edit]The station has 3 exits. Exits B and D opened with the station's initial opening, and Exit A opened on 16 January 2020.
History
[edit]In the 1997 "Guangzhou City Urban Expressway, Traffic Line Network Planning Study (Final Report)", this station appeared as the then Gongye Avenue station on Line 4 and later became part of the existing Guangzhou section of the Guangzhou Metro in the 2003 plan.
Construction of this station began in August 2009. In December the same year, a water pipe burst due to the settlement of the foundation, affecting the water supply of tens of thousands of nearby residents.[2] In 2011, the construction of the main structure of the station was completed. Subsequently, the construction party began to fence the southern section of Gongye Avenue South to build exits 3 and 4, but due to the complexity of the land ownership issue, construction did not start until August 2013, during which the authorities criticized the construction for being overdue.[3][4] After the completion of the underground civil works, due to the delay of the construction of the terminus at Lijiao station, it was not possible to open the station in 2015 together with the Xilang-Yangang section, and the station was still enclosed for a period of time.[5]
With the completion of construction of Lijiao station, the section from this station to Lijiao station was handed over for operation and commissioning on 23 September 2018.[6] On 28 December the same year, the station was opened with the opening of the Yangang to Lijiao section of the Guangfo Metro.[7]
During COVID-19 pandemic control rules at the end of 2022, due to the impact of prevention and control measures, station service was suspended from 09:00 on 5 November 2022 to the afternoon of 30 November 2022.[8] During that time, it served candidates for college entrance examinations and other examinations, and normal services were still provided until 09:00 on the 5th and 6th.[9]
References
[edit]- ^ Guangzhou - Foshan rapid rail starts construction June 28
- ^ 林良田 (2009-12-10). "地铁工地爆水管万户居民停水" [Water pipe burst at subway construction site, thousands of households without water]. New Express Daily (in Simplified Chinese). Archived from the original on 2023-05-08. Retrieved 2025-07-09 – via Sina Corporation.
- ^ 黄宙辉 (2013-03-21). "地铁公司:石溪站占道多年实属无奈借地已有初步解决方案" [Metro Company: Shixi Station has occupied the road for many years and has no choice but to borrow the land. A preliminary solution has been found]. Yangcheng Evening News (in Simplified Chinese). Archived from the original on 2013-03-22. Retrieved 2025-07-09.
- ^ 张亮 (2015-05-21). "广州:"霸王挖路"被查近一个月 施工照常进行" [Guangzhou: The "overlord digging road" has been investigated for nearly a month, and construction is proceeding as usual]. New Express Daily (in Simplified Chinese). Archived from the original on 2023-05-08. Retrieved 2025-07-09 – via Sohu News.
- ^ 史倩云 (2016-04-12). "广州地铁飞站之困:地铁飞站多因征地拆迁难" [The dilemma of Guangzhou Metro's overlapping stations: Many subway stations are due to the difficulty of land acquisition and demolition]. Information Times (in Simplified Chinese). Archived from the original on 2016-04-21. Retrieved 2025-07-09 – via Sina Corporation.
- ^ 奚慧颖 (2018-11-15). "广佛线石溪至沥滘段进入运营筹备阶段" [The Shixi to Lijiao section of the Guangzhou-Foshan line has entered the operational preparation stage]. Information Times (in Simplified Chinese). Archived from the original on 2023-04-13. Retrieved 2025-07-09 – via Sina Corporation.
- ^ 郭苏莹 (2018-12-28). "今日广州地铁三线齐发 搭乘地铁快车38分钟可达从化" [Today, Guangzhou Metro's three lines are launched simultaneously. It takes 38 minutes to reach Conghua by taking the subway express train]. Information Times (in Simplified Chinese). Archived from the original on 2019-06-03.
- ^ "广州市内所有地铁站逐步恢复正常运营" [All subway stations in Guangzhou gradually resume normal operations]. Daily Economic News. 2022-11-30. Archived from the original on 2022-11-30.
- ^ 谭超 (2022-11-04). "11月5日海珠所有地铁车站和有轨电车暂停服务,换乘站内可换乘" [All subway stations and trams in Haizhu will be suspended on November 5. Transfers are allowed at transfer stations.]. Southern Network. Archived from the original on 2022-11-04.