Jump to content

ORP Kurp

From Wikipedia, the free encyclopedia
Polish M-class submarines in port
Polish M-class submarines in port
History
Soviet Union
NameM-246
BuilderSudomekh Shipyard, Leningrad
Laid downJanuary 25, 1949
LaunchedJuly 24, 1949
CommissionedNovember 16, 1949
DecommissionedApril 29, 1955
History
Poland
NameORP Kurp
CommissionedMay 27, 1955
DecommissionedDecember 31, 1966
Fatescrapped
General characteristics
Class & typesubmarine
TypeM-XV [pl]
Displacement
  • surfaced: 283 t (279 long tons)
  • submerged: 353 t (347 long tons)
Length49.5 m (162 ft 5 in)
Beam4.4 m (14 ft 5 in)
Draft2.6–2.8 m (8 ft 6 in – 9 ft 2 in)
Propulsion
Speed
  • surfaced: 15.7 kn (29.1 km/h; 18.1 mph)
  • submerged: 7.8 kn (14.4 km/h; 9.0 mph)
Range
  • surfaced: 4,500 nautical miles at a speed of 8 kn (15 km/h; 9.2 mph)
  • submerged: 85 nautical miles at a speed of 2.9 kn (5.4 km/h; 3.3 mph)
Crew31
Armament
Profile of an M-class submarine

ORP Kurp was a Polish submarine of the Cold War era, originally the Soviet M-246, one of six Soviet M-class submarines leased to Poland. With a displacement of 283 tons surfaced and 353 tons submerged, its primary armament consisted of four 533 mm torpedoes launched from four internal torpedo tubes. The submarine achieved a surface speed exceeding 15 knots, with a range of 4,500 nautical miles at 8 knots.

Launched on 24 July 1949 at the Sudomekh Shipyard in Leningrad, the submarine was commissioned into the Soviet Navy on 16 November 1949, assigned to the Baltic Fleet. Leased to Poland in 1955, it was commissioned into the Polish Navy on 27 May of that year. Bearing the pennant numbers M-105, P-105, and later 306, the submarine was withdrawn from service on 31 December 1966 after intensive use and was subsequently scrapped.

Design and construction

[edit]

Development of small M-class submarines began in the Soviet Union in the 1930s, with serial production of Series VI, VIbis, and XII, totaling 96 units (30 Series VI, 20 Series VIbis, and 46 Series XII).[1] In the late 1930s, to expand the Soviet Navy, work started on a new small submarine design based on the Series XII.[1][2] On 13 August 1938, the tactical-technical specifications for a larger version were approved.[1] In August 1938, chief engineer Fiodor Połuszkin of the Rubin Design Bureau developed two preliminary designs, M-VI and M-VII, with M-VII selected for further development.[1][2] This design featured a semi-double-hull structure, four torpedo tubes, a twin-shaft engine room with increased power, and enhanced range and diving depth.[3][4] External saddle ballast tanks were detachable, enabling rail transportation.[2][5]

On 23 July 1939, the M-VII design was approved by the Soviet Navy, and the Rubin Design Bureau developed the detailed Project 96 (Series XV) documentation, finalized on 8 February 1940.[1][3] On 31 March 1940, the keels of the first two Project 96 units, M-200 and M-201, were laid at the Sudomekh Shipyard in Leningrad.[1] During World War II, 15 Series XV submarines were under construction at Sudomekh and the Krasnoye Sormovo Factory No. 112 in Gorky, with only four completed by the war's end; a total of 57 units were built by 1953, generally to the same specifications, aside from equipment upgrades.[1][6]

M-246 was constructed at Shipyard No. 196 in Leningrad (yard number 382).[7][8] Its keel was laid on 25 January 1949, and it was launched on 24 July 1949.[7][9]

Technical specifications

[edit]

General characteristics

[edit]

ORP Kurp was a small submarine with a semi-double-hull design, intended for coastal operations and suited to the wave conditions of the Baltic Sea.[5][10] Constructed from steel using welding joints, the hull was divided by five watertight bulkheads into six compartments, from bow to stern: I – torpedo room (with sailors' bunks), II – crew quarters, III – main control room, IV – additional crew quarters, V – diesel engines, and VI – electric motors. A sail was located above the control room, with rechargeable batteries beneath the crew quarters.[1][6] External saddle ballast tanks were positioned along the port and starboard from mid-compartment I to mid-compartment V, with an additional ballast tank at the stern within the pressure hull; a trim tank and quick-diving tank were located under compartment III.[1][6] Bow rudders were positioned at the torpedo compartment, with stern diving planes and a single rudder aft of the propellers.[1]

The overall length was 49.5 metres, beam 4.4 metres, and draft ranged from 2.6 metres at the bow to 2.8 metres at the stern. Normal surface displacement was 283 tons, and submerged displacement was 353 tons.[8][11] The maximum test depth was 80 metres, with an operational depth of 60 metres.[8][12] The maximum continuous submerged endurance was 48 hours.[1] The autonomy was 14 days.[13][14]

The crew comprised 31 personnel: 6 officers, 15 non-commissioned officers, and 10 sailors.[15][16]

Propulsion

[edit]

The submarine was powered on the surface by two 11D diesel engines, each producing 441 kW (600 hp), with exhausts vented through pipes to the sail.[15][17] Submerged propulsion was provided by two PG-17 electric motors, each delivering 160 kW (218 hp).[15][18] Two shafts driving two propellers enabled a maximum speed of 15.7 knots surfaced and 7.8 knots submerged (economical speeds were 10 and 3 knots, respectively).[8][11] The range was 4,500 nautical miles at 8 knots surfaced and 85 nautical miles at 2.9 knots submerged (or 965 nautical miles at maximum surface speed and 9.7 nautical miles at maximum submerged speed).[1][2] The fuel capacity was 28 tons.[11][16] Electrical energy was stored in two 2-MS lead-acid batteries, each with 60 galvanic cells.[18]

Armament and equipment

[edit]

The submarine was equipped with four fixed bow torpedo tubes of 533 mm caliber, carrying four torpedoes.[8][18] It used steam-powered 53-38 torpedoes, each 7.19 metres long, weighing 1,615 kg (including a 300 kg explosive warhead) with a contact fuze. The torpedo's range was 4,000 metres at 44.5 knots or 8,000 metres at 34.5 knots.[18][19] Guidance was provided by a gyroscope, with a diving depth of 0 to 14 metres.[20] Torpedoes could be launched from depths up to 30 metres and were loaded from the bow in port using a crane, with the stern submerged and bow raised via ballast tanks.[18][21]

The initial artillery armament was a single 45 mm 21-KM deck gun mounted forward of the sail, with 200 rounds of ammunition.[8][18] The gun weighed 867 kg, with an elevation range of -10° to +85°, a horizontal range of 11,000 metres, and a vertical range of 7,000 metres.[12][22] It used fixed ammunition weighing 2.389 kg (projectile 1.43 kg, propellant 0.384 kg, case 0.575 kg), including fragmentation-tracer, fragmentation, incendiary, armor-piercing-tracer, and cast iron (blanks) rounds, fired at a rate of 30–40 rounds per minute.[12]

Some sources mention the possibility of carrying AMD-500 bottom mines instead of torpedoes,[8][21] but as these were aviation mines, Polish Series XV submarines did not carry them.[18][23] Other sources suggest the submarine was also armed with two 7.62 mm machine guns.[4][24]

Electronic equipment included an R-641 radio with a mast antenna for communication at a periscope depth of 5 metres, a Mars-16K passive sonar with a range of 30 cables, and a radio direction finder with an antenna on the sail.[1][18] A single PZ-7 periscope served as the optical detection system.[6][22] Rescue equipment included an rescue buoy with a wired telephone, radio signal transmitter, and signal light, as well as RUKTY devices that absorbed carbon dioxide and released oxygen.[25]

Service history

[edit]
Polish acquisition of M-class submarines in 1954 or 1955

M-246 was commissioned into the Soviet Navy on 16 November 1949[9][8] and assigned to the Baltic Fleet.[10][24]

In 1953, due to the deteriorating condition of the Polish Submarine Division's ORP Ryś and ORP Żbik, Poland negotiated with the Soviet Union to lease submarines and submarine chasers.[15][26] In 1954, the Soviet Union agreed to lease four Project 96 submarines, followed by two more in 1955, along with four Kronshtadt-class submarine chasers.[15][27] The lease term for the submarines was eight years, costing 93,000 rubles annually per unit.[26][27]

On 27 May 1955, the last two leased submarines, under the names ORP Kurp and ORP Kujawiak, were ceremonially incorporated into the Polish Navy, as formalised by Order No. 019/Org. of the Navy Commander dated 19 June that year.[7][28] M-246 was officially struck from the list of the Soviet fleet on 29 April 1955.[9] The first Polish commander was Lieutenant Jerzy Missima.[8] Designated M-105, ORP Kurp joined the Submarine Division alongside ORP Kujawiak, ORP Sęp, ORP Ryś, ORP Żbik, ORP Kaszub, ORP Krakowiak, ORP Ślązak and ORP Mazur.[29] The submarine's technical condition was poor, resulting in it being sent for several months of shipyard repairs; additionally, no technical documentation for the submarines was provided.[30] On 16 September 1955, ORP Kurp was assigned to the newly formed 1st Submarine Brigade, replacing the Submarine Division.[9][31]

In 1956, the command of the 1st Submarine Brigade was assigned the following tasks: to prepare submarines for operations in coastal waters in cooperation with aviation, to begin training in executing group torpedo attacks, to improve reconnaissance capabilities and the conduct of base-blocking operations and evasion of anti-submarine warfare (ASW) forces, and to initiate training in penetrating ASW defence zones.[32][33] In June of that year, Kurp, Kurp, and Ślązak participated in fleet exercises conducted in the waters of the Gdańsk Bay.[32] At the end of 1956, ORP Kurp was awarded the title of leading vessel of the Polish Navy.[34] In the following training year, the assigned tasks included: improving the conduct of operations by day and night, conducting reconnaissance and enemy base blockades, firing torpedoes, operating along the presumed enemy's communication lines, performing patrol duties, and exercises in landing small sabotage groups.[32][33] In the first half of March 1957, Kurp, Krakowiak, and Mazur took part in a navigational training cruise that included visits to Szczecin and Świnoujście.[32] In July and August, Kurp, Krakowiak, and Kujawiak sailed autonomously to the North Sea, reaching the eastern coast of Great Britain.[32][35] That summer, the 45 mm deck gun was removed.[22][36] On 15 December, the pennant number changed to P-105.[36][37]

In subsequent years, all Polish Project 96 submarines conducted intensive training cruises, regular torpedo firings, simulated attacks on enemy communications, base blockades, reconnaissance, and coordination with surface ships and aircraft.[36] On 1 January 1960, the pennant number changed to 306.[36][38] That same year, due to the deteriorating technical condition of the hulls of Project 96 submarines, the Naval Command decided to limit their maximum diving depth to 40 metres and to restrict underwater operations to areas with a maximum depth of 60 metres.[34]

In 1962, Poland purchased the leased submarines from the Soviet Union for 400,000 PLN each.[26][28] From April to July 1962, the submarine underwent a hull inspection and maintenance in a dry dock at the Remontowa shipyard.[34] That autumn, the Naval Command's Technical Committee recommended decommissioning all Project 96 submarines due to difficulties assessing hull integrity without Soviet documentation, further limiting the diving depth to 20 metres. By mid-1963, Kurp and Kujawiak still formed part of the combat group of the 1st Submarine Brigade.[34] In 1966, Kurp and Kujawiak participated in Polish fleet exercises for the last time. In the second half of June that year, Kurp trained with Volksmarine vessels, and her crew visited Sassnitz.[39]

The final flag-lowering ceremony occurred on 31 December 1966, and the submarine was struck from the fleet on the same day, per Naval Command Order No. 078/Org. of 12 December of that year.[28][38] The crew was disbanded under Order No. 09/Org. of 15 March 1967.[28] The decommissioned submarine was subsequently scrapped in Gdańsk.[39]

References

[edit]
  1. ^ a b c d e f g h i j k l m Rochowicz, Robert (1997). "Małe okręty podwodne projektu 96 (M-XV)" [Small Submarines of Project 96 (M-XV)]. Nowa Technika Wojskowa (in Polish). 7. Magnum-X: 55–57. ISSN 1230-1655.
  2. ^ a b c d Pietlewannyj, M.B. (2009). Korabli stran Warszawskogo dogowora Корабли стран Варшавского договора [Ships of the Warsaw Pact Countries] (in Russian). Saint Petersburg: Galeja Print. pp. 108–109. ISBN 978-5-8172-0127-7.
  3. ^ a b Rochowicz (2017, p. 25)
  4. ^ a b Fontenoy, Paul E. (2007). Submarines: An Illustrated History of Their Impact. Santa Barbara, California: ABC-CLIO. p. 276. ISBN 1-85367-623-3.
  5. ^ a b Gogin, Ivan. ""Series XV" submarines (M-200) (project 96) (1943–1953)". Navypedia. Retrieved 2025-05-03.
  6. ^ a b c d Rochowicz (2017, p. 26)
  7. ^ a b c Ciślak, Jarosław (2012). "Dywizjon Okrętów Podwodnych 1945–2011" [Submarine Division 1945–2011]. Morze, Statki i Okręty (in Polish). 5 (123). Magnum-X: 21. ISSN 1426-529X.
  8. ^ a b c d e f g h i Koszela, Witold (2017). Okręty Floty Polskiej [Ships of the Polish Fleet] (in Polish). Vol. I. Oświęcim: Napoleon V. p. 280. ISBN 978-83-65746-67-2.
  9. ^ a b c d Rochowicz (2017, p. 28)
  10. ^ a b Górski (2011, p. 76)
  11. ^ a b c Górski (2011, p. 77)
  12. ^ a b c Górski (2011, p. 79)
  13. ^ Piwowoński, Jan (1989). Flota spod biało-czerwonej [Fleet Under the White-and-Red] (in Polish). Warsaw: Nasza Księgarnia. p. 329. ISBN 83-10-08902-3.
  14. ^ Górski (2011, pp. 77–78)
  15. ^ a b c d e Ciesielski, Czesław; Pater, Walter; Przybylski, Jerzy (1992). Polska Marynarka Wojenna 1918–1980 [Polish Navy 1918–1980] (in Polish) (1st ed.). Warsaw: Bellona. p. 221. ISBN 83-1108-202-2.
  16. ^ a b Sołkiewicz (2018, p. 110)
  17. ^ Rochowicz (2017, pp. 26–27)
  18. ^ a b c d e f g h Rochowicz (2017, p. 27)
  19. ^ DiGiulian, Tony. "Torpedoes of Russia/USSR: 533 mm (21") 53-38". navweaps.com. Retrieved 2025-05-03.
  20. ^ Sołkiewicz (2018, p. 120)
  21. ^ a b Górski (2011, p. 78)
  22. ^ a b c Sołkiewicz (2018, p. 122)
  23. ^ Sołkiewicz (2018, p. 121)
  24. ^ a b Volkov, Roman; Brichevsky, Andrew. "Small submarines – Project 96". RussianShips.info. Retrieved 2025-05-03.
  25. ^ Górski (2011, p. 80)
  26. ^ a b c Sołkiewicz (2018, p. 104)
  27. ^ a b Rochowicz (2017, pp. 23–24)
  28. ^ a b c d Rochowicz (2017, p. 24)
  29. ^ Rochowicz (2017, pp. 24, 28)
  30. ^ Rochowicz (2017, p. 29)
  31. ^ Sołkiewicz (2018, p. 131)
  32. ^ a b c d e Rochowicz (2017, p. 30)
  33. ^ a b Sołkiewicz (2018, p. 125)
  34. ^ a b c d Rochowicz (2017, p. 32)
  35. ^ Górski (2011, p. 81)
  36. ^ a b c d Rochowicz (2017, p. 31)
  37. ^ Rochowicz, Robert (1998). "Rok 1957" [Year 1957]. Morza, Statki i Okręty (in Polish). 4 (11). Magnum-X: 31. ISSN 1426-529X.
  38. ^ a b Serafin, Mieczysław (2008). Polska Marynarka Wojenna 1945–2007. Kronika wydarzeń [Polish Navy 1945–2007: Chronicle of Events] (in Polish). Gdynia: Zespół Redakcyjno-Wydawniczy Marynarki Wojennej. pp. 64, 84. ISBN 978-83-88698-03-3.
  39. ^ a b Rochowicz (2017, p. 33)

Bibliography

[edit]
  • Górski, Tadeusz (2011). "Malutki ORP "Krakowiak"" [Small ORP "Krakowiak"]. Okręty Wojenne (in Polish). 4 (108). Tarnowskie Góry: Wydawnictwo Okręty Wojenne. ISSN 1231-014X.
  • Rochowicz, Robert (2017). "Malutkie pod polską banderą" [Small Submarines Under the Polish Flag]. Morze (in Polish). 4 (19). ZBiAM. ISSN 2543-5469.
  • Sołkiewicz, Henryk, ed. (2018). Ewolucyjny rozwój sił okrętowych Marynarki Wojennej w latach 1945–2010 [Evolutionary Development of the Polish Navy's Naval Forces 1945–2010] (in Polish) (2nd ed.). Gdynia; Warsaw: Akademia Marynarki Wojennej. ISBN 978-83-65409-84-3.