Draft:Nanpu West station

From Wikipedia, the free encyclopedia
Nanpu West

南浦西
Guangzhou Metro
Chinese name
Chinese南浦西
Transcriptions
Standard Mandarin
Hanyu PinyinNánpǔ Xī Zhàn
Yue: Cantonese
Jyutpingnaam4 pou4 sai1 zaam6
General information
LocationPanyu District, Guangzhou, Guangdong
China
Coordinates23°2′28.28″N 113°15′19.22″E / 23.0411889°N 113.2553389°E / 23.0411889; 113.2553389
Operated byGuangzhou Metro Co. Ltd.
Line(s)     Line 22
Platforms2 (1 island platform)
Tracks2
Construction
Structure typeUnderground
AccessibleYes
Other information
Station code2205
History
Opened2025; 0 years ago (2025)
Services
Preceding station Guangzhou Metro Following station
Nanjiao
towards Fangcun
Line 22 Chentougang
towards Panyu Square

Nanpu West station is a station on the Guangzhou Metro Line 22 under construction. It is located on the west of the Dongxin Expressway Overpass in the Panyu District of Guangzhou. It is expected to open in late 2025.

Station layout

[edit]

The station has four floors. The ground level is the station's entrances and exits, surrounded by buildings and farmland such as the Dongxin Expressway Overpass, Xixiang 3rd Road, Nanpu West 3rd Village, and Minjie Jinyuewan Community; the first floor connects the entrances and exits to the concourse; the second floor is the concourse; the third floor is the station equipment area; and the fourth floor has the Line 22 platform.

L1
Exits
Exits Exits, Security Facilites
L2
Concourse
Lobby Ticket Machines, Customer Service, Shops, Police Station
L3 Equipment Area Station equiments
L4
Platforms
Platform 1 arrow for L  22  towards Fangcun (Nanjiao)
Island platform, doors will open on the left
Platform 2  22  towards Panyu Square (Chentougang) arrow for R

Exits

[edit]

The station has 3 exits, and a reserved exit in the southeast.[1]

History

[edit]

In June 2020, the station's name was changed from its planning name "West Third Station" to its official name "Nanpu West Station".[2]

On 30 April 2020, the construction of this station officially began; and on 15 December 2022, the main structure was topped out, becoming the first station to be topped out in the remaining section of Line 22 Phase 1.[3][4]

On 17 December 2022, the construction works of the remaining section of Line 22 (Chentougang to Fangcun) have been completed by 28%. Among the four stations, one has completed the main structure capping, and the other three are undergoing civil engineering works. Among the four sections of tunnel, one is undergoing civil engineering works, and the other three are undergoing pre-construction preparations.[5]

On 18 June 2024, the construction works of the remaining section of Line 22 has been completed by 68%. Among the 4 stations, 3 have been capped and 1 is undergoing civil engineering construction. Among the 4 sections of tunnel, 1 has been connected and 3 are undergoing civil engineering construction; with a total of 5 shield tunneling machines excavating.[6]

As of 7 December 2024, with the completion of the steel sleeve reception of the left-line tunnel boring machine in the Nanpu West to Nanjiao section, the Line 22 remaining section tunnel has been fully excavated, completing the construction works by 91%. All four stations have been capped and electromechanical construction has begun, and all four sections of tunnel have been connected.[7][8]

Future expansion

[edit]

In the future, this station will become a transfer station for Line 22 and Line 19 [zh]. However, Line 19 is a long-term route and it currently has no transfer provisions.

References

[edit]
  1. ^ "南浦西地铁站周边是否有规划商业". 人民网领导留言板. 2023-09-14. Archived from the original on 2023-09-20. Retrieved 2023-09-20.
  2. ^ "关于公开征求对市轨道交通十八、二十二号线工程车站名称意见的公告". 广州市民政局. 2020-06-17. Archived from the original on 2021-09-25. Retrieved 2020-06-18.
  3. ^ "地铁二十二号线后通段首站封顶". 廣州日報. 2022-12-16. Archived from the original on 2022-12-16. Retrieved 2022-12-16.
  4. ^ "广州地铁22号线南浦西站施工进展顺利". 搜狐新闻 (in Chinese (China)). 2022-06-01. Retrieved 2025-06-22.
  5. ^ "地铁二十二号线南浦西站封顶". 广州市人民政府 (in Chinese (China)). 2022-12-17. Retrieved 2025-06-22.
  6. ^ "二十二号线后通段西塱站封顶". 广州市人民政府 (in Chinese (China)). 2024-06-18. Retrieved 2025-06-22.
  7. ^ "地铁二十二号线隧道全面贯通 后通段土建工程累计完成91%". 广州市人民政府 (in Chinese (China)). 2024-12-07. Retrieved 2025-06-22.
  8. ^ "通了!广州22号线后通段全线隧道贯通!全线预计2025年通车". 搜狐新聞 (in Simplified Chinese). 2024-12-06. Retrieved 2025-06-22.