Dongbeiwang station
Beijing Subway station | |||||||||||
![]() Construction site | |||||||||||
Chinese name | |||||||||||
Simplified Chinese | 东北旺站 | ||||||||||
Traditional Chinese | 東北旺站 | ||||||||||
| |||||||||||
General information | |||||||||||
Location | Southeast side of the intersection of Houchangcun Road (后厂村路), Tangjialing Road (唐家岭路) and Software Park No. 4 Road (软件园四号路), Shangdi Subdistrict Haidian District, Beijing China | ||||||||||
Coordinates | 40°03′07″N 116°17′20″E / 40.051919°N 116.28875°E | ||||||||||
Operated by | Beijing Mass Transit Railway Operation Corporation Limited | ||||||||||
Line(s) | Line 13 (Line 13B) | ||||||||||
Platforms | 2 (1 island platform) | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Accessible | Yes | ||||||||||
History | |||||||||||
Opened | Late-2025 (expected) | ||||||||||
Previous names | Houchangcun (后厂村) (planning name) | ||||||||||
Services | |||||||||||
| |||||||||||
|
Dongbeiwang station (simplified Chinese: 东北旺站; traditional Chinese: 東北旺站; pinyin: Dōngběiwàng zhàn) is a future station on Line 13B of the Beijing Subway. It is expected to open in late 2025 as the western terminus of the combined newly constructed section of the planned Lines 13A and 13B, known as the Yizi line.[1][2]
Location
[edit]The station is located under the southeast side of the intersection of Houchangcun Road, Tangjialing Road and Software Park No. 4 Road in Shangdi Subdistrict in Haidian District.[3][4]
Station features
[edit]The station will have an underground island platform.
History
[edit]The station was previously named as Houchangcun (Chinese: 后厂村; pinyin: Hòuchǎngcūn). On March 20, 2025, the Beijing Municipal Commission of Planning and Natural Resources announced the naming plan for the expansion and upgrading project of Line 13, and planned to name the station as Dongbeiwang.[5]
On November 30, 2023, the main structure of the station was topped out.[3]
References
[edit]- ^ "昌平回天地区将推进74个项目建设 13号线扩能提升工程今年实现局部通车" [Huilongguan-Tiantongyuan Area in Changping District will promote the construction of 74 projects. The expansion and upgrading project of Line 13 will be partially opened to traffic this year.] (in Simplified Chinese). 2025-01-09. Retrieved 2025-06-08.
其中,地铁13号线扩能提升工程将实现后厂村至天通苑东段竣工通车
[Among them, the expansion and upgrading project of Metro Line 13 will complete the opening of the section from Houchangcun to Tiantongyuandong.] - ^ "13号线扩能提升工程小辛庄停车场迎来重大进展" [Xiaoxinzhuang parking lot of Line 13 capacity expansion project has made significant progress] (in Simplified Chinese). Retrieved 2025-06-08.
该项目位于13号线一字线中段
[The project is located in the middle section of Line 13 Yizi.] - ^ a b "轨道交通13号线后厂村站车站主体结构提前30天封顶" [The main structure of Houchangcun Station on Metro Line 13 was topped out 30 days ahead of schedule] (in Simplified Chinese). 2023-12-08. Archived from the original on 2024-06-02. Retrieved 2025-06-08.
- ^ "北京轨道交通13号线后厂村站车站主体结构顺利封顶" [The main structure of Houchangcun Station on Beijing Metro Line 13 has been successfully topped out] (in Simplified Chinese). 2023-12-02. Archived from the original on 2024-05-30. Retrieved 2025-06-08.
- ^ "关于轨道交通13号线扩能提升工程车站命名预案的公示(公示期限7天)" [Publicity on the naming plan for the station of Metro Line 13 capacity expansion and upgrading project (publicity period 7 days)] (in Simplified Chinese). 2025-03-20. Archived from the original on 2025-03-20. Retrieved 2025-06-15.