Jump to content

Dahanukarwadi metro station

From Wikipedia, the free encyclopedia

Dahanukarwadi
Mumbai Metro station
General information
LocationKandivli, Mahatma Gandhi Nagar, Kandivli West, Mumbai, Maharashtra 400067
Coordinates19°12′22″N 72°50′05″E / 19.20624°N 72.83476°E / 19.20624; 72.83476
Owned byMumbai Metropolitan Region Development Authority (MMRDA)
Operated byMaha Mumbai Metro Operation Corporation Limited (MMMOCL)
Line(s)Yellow Line 2A
Platforms3 (1 side platform and 1 island platform)
Tracks3
Construction
Structure typeElevated, Double track
ParkingNo
History
Opened2 April 2022; 3 years ago (2022-04-02)
Services
Preceding station Logo of the Mumbai Metro Mumbai Metro Following station
Kandivli West
towards Dahisar East
Yellow Line 2A Valnai - Meeth Chowky
towards Andheri West
Location
Map

Dahanukarwadi is an elevated metro station serving Dahanukarwadi neighbourhood of Kandivli on the North-South corridor of the Yellow Line 2A of Mumbai Metro in Mumbai, India. This station is owned by the Mumbai Metropolitan Region Development Authority (MMRDA), and was inaugurated on 2 April 2022.[1][2]

History

[edit]

J Kumar Infraprojects was awarded the contract to construct the station in June 2016.[3] The MMRDA announced that electrification of the line had been completed on 26 May 2020.[4] Dahanukarwadi was opened to the public on 2 April 2022, along with the first phase of Line 2A.[5][6]

Station layout

[edit]
Platform Level Side platform, doors will open on the left
Platform 2      Yellow Line 2A toward Andheri West (Valnai - Meeth Chowky)
Platform 1      Yellow Line 2A toward Dahisar East (Lower Oshiwara)
Island platform, doors will open on both sides
Platform 1A      Yellow Line 2A toward Dahisar East (Lower Oshiwara)
C Concourse Fare control, station agent, Metro Card vending machines, crossover
G Road level Exit/Entrance

Power and signaling system

[edit]

Like all other stations and railways of Mumbai metro, Dahanaukarwadi station also uses 25,000 volt AC power system by overhead catenary to operate the trains.

References

[edit]
  1. ^ "Mumbai Metro: Line 2A, Line 7 launched, check routes, station details here". DNA India. Retrieved 18 April 2023.
  2. ^ "Mumbai Metro's 2A & 7 Lines to Cover Andheri to Dahisar in Just 75 Minutes | Know Fare, Routes as Ops Begin Today". News18. 20 January 2023. Retrieved 18 April 2023.
  3. ^ "Tainted J Kumar Infraporjects bags Dahisar-DN Nagar Metro 2A project". dna. 9 August 2016. Archived from the original on 15 October 2016. Retrieved 14 October 2016.
  4. ^ "MMRDA to conduct test run for two elevated Metro lines next week". Mumbai Mirror. IANS. 26 May 2021. Retrieved 9 July 2023.
  5. ^ "Mumbai: Phase 1 of Metro Line 2A and 7 opened for public". The Indian Express. 3 April 2022. Retrieved 9 July 2023.
  6. ^ "Mumbai Metro: These 2 lines to get operational today. Check route, other details". mint. 19 January 2023. Retrieved 18 April 2023.