Jump to content

Bidar–Nanded Railway Line

From Wikipedia, the free encyclopedia
Bidar–Nanded Railway Line
Overview
StatusProposed
OwnerIndian Railways
Termini
StationsBidar (Karnataka) and Nanded (Maharashtra)[3]
History
OpenedTBD
Technical
Line length155KM[4]
Number of tracksTBD
Track gaugeTBD
ElectrificationTBD
Operating speedTBD
Highest elevationTBD

The Bidar–Nanded Railway Line (Bidar-Nanded Rail Project)[5] (via Aurad) is a proposed railway route connecting Bidar in Karnataka and Nanded in Maharashtra via Aurad in Karnataka.[6]

References

[edit]
  1. ^ "Maharashtra, Karnataka urged to give land, bear half cost of Nanded-Bidar line: Minister". Udayavani. Retrieved 2025-06-26.
  2. ^ "Bidar-Nanded rail line project to be revived". The Hindu. Retrieved 2025-06-26.
  3. ^ "Maharashtra, Karnataka urged to give land, bear half cost of Nanded-Bidar line: Minister". The Print. 2023-10-25. Retrieved 2025-06-26.
  4. ^ "New railway line between Nanded and Bidar on cards". The Times of India. Retrieved 2025-06-26.
  5. ^ "Centre Awaits Karnataka Nod for Bidar-Nanded Rail Line Project". Construction World. Retrieved 2025-06-26.
  6. ^ "Regarding Construction of Bidar-Nanded Railway Line". Parliament Digital Library. Government of India. Retrieved 2025-06-26.
[edit]