Jump to content

Beishan station

Coordinates: 23°5′9.49″N 113°22′12.94″E / 23.0859694°N 113.3702611°E / 23.0859694; 113.3702611
From Wikipedia, the free encyclopedia
Beishan

北山
Guangzhou Metro
Platform
Chinese name
Chinese北山站
Transcriptions
Standard Mandarin
Hanyu PinyinBěishān Zhàn
Yue: Cantonese
Yale RomanizationBāksāan Jaahm
JyutpingBak1saan1 Zaam6
General information
LocationSoutheast side of the intersection of Xinjiao East Road (新滘东路) and Keyuan South Road (科韵南路)
Guanzhou Subdistrict [zh], Haizhu District, Guangzhou, Guangdong
China
Coordinates23°5′9.49″N 113°22′12.94″E / 23.0859694°N 113.3702611°E / 23.0859694; 113.3702611
Operated byGuangzhou Metro Co. Ltd.
Line(s)
Platforms2 (1 island platform)
Tracks2
Construction
Structure typeUnderground
AccessibleYes
Other information
Station code1222
History
Opened29 June 2025; 18 days ago (2025-06-29)
Services
Preceding station Guangzhou Metro Following station
Chisha
towards Ersha Island
Line 12
East section
Guanzhou

Beishan station (Chinese: 北山站; pinyin: Běishān Zhàn; Cantonese Yale: Bāksāan Jaahm) is a station on Line 12 of the Guangzhou Metro. It is located underground on the southeast side of the intersection of Xinjiao East Road and Keyuan South Road in Haizhu District of Guangzhou. It opened on 29 June 2025.[1]

Station layout

[edit]

The station has two floors. The ground level is the exit, and it is surrounded by Keyuan South Road, Beishan Village, Guanzhou Beiyuan and other nearby buildings. The first floor is the concourse, and the second floor is the platform for Line 12.

G - Exits A, B1, B3, C
L1
Concourse
Lobby Ticket Machines, Customer Service, Shops, Police Station, Security Screening Facilities
L2
Platforms
Platform 2 arrow for L  12  towards Ersha Island (Chisha)
Island platform, doors will open on the left
Platform 1  12  towards Higher Education Mega Center South (Guanzhou) arrow for R

Concourse

[edit]

There are automatic ticket machines and an AI customer service center at the concourse. There are elevators, escalators, and stairs in the fare-paid area for passengers to reach the platform.

Platform

[edit]

The station has an island platform located underground on Keyuan South Road.[2]

In addition, there is a storage track at the south end of the platform towards Guanzhou station.

Platform panorama

Exits

[edit]

The station has 4 exits for entering and exiting.

Exit letter Gallery Exit location Nearby
B1 Keyuan South Road Bus interchange Public Bus: Beishan Station Stop (Southbound)
B2 Keyuan South Road Luntou Village
Bus interchange Public Bus: Beishan Station Stop (Northbound)
B3 Keyuan South Road
C Keyuan South Road

History

[edit]

The station was called Luntou station during planning and construction.[3] In March 2020, the station completed the pouring of the first ground connecting wall, and in November the same year, it passed the foundation pit excavation acceptance and entered the stage of full excavation construction.[4] In January 2025, the station completed the "three rights" transfer.[5]

In August 2024, the initial names of the eastern section of Line 12 stations was announced, and the station was renamed Beishan station.[6] However, the name change caused dissatisfaction among Luntou Village, and the Civil Affairs Bureau responded that it would ask the authorities to further verify the location of the station and the land use.[7] In April of the following year, the official station name of the eastern section of Line 12 was announced, and the station kept the name of Beishan station.[8]

On 29 June 2025, the station opened.[1]

References

[edit]
  1. ^ a b 郑慧梓 (2025-06-29). "开闸了!广州地铁10号线、12号线东西段正式开通" [The gates are open! The east and west sections of Guangzhou Metro Line 10 and Line 12 are officially opened]. Nanfang Daily (in Simplified Chinese). Archived from the original on 2025-06-29. Retrieved 2025-07-01.
  2. ^ "广州市轨道交通十二号线工程(浔峰岗~大学城南)环境影响评价第二次公示" [Second Public Notice of Environmental Impact Assessment of Guangzhou Metro Line 12 (Xunfenggang-Higher Education Mega Center South)] (in Simplified Chinese). Archived from the original on 2018-02-02. Retrieved 2025-06-24.
  3. ^ "广州地铁项目仑头站首幅地连墙浇注完成" [The first ground-connected wall pouring of Luntou Station of Guangzhou Metro Project was completed]. CCCC Guangzhou Construction (in Simplified Chinese). 2020-03-30. Archived from the original on 2023-06-24. Retrieved 2025-06-24 – via Official WeChat Account.
  4. ^ "广州地铁十二号线项目仑头站顺利通过基坑开挖验收" [Guangzhou Metro Line 12 Project Luntou Station successfully passed the foundation pit excavation acceptance]. CCCC Guangzhou Construction (in Simplified Chinese). 2020-03-30. Archived from the original on 2023-06-24. Retrieved 2025-06-24 – via Official WeChat Account.
  5. ^ 郑慧梓 (2025-02-02). "广州地铁12号线进度超九成!四座车站移交运营调试" [Guangzhou Metro Line 12 is over 90% complete! Four stations handed over for operation and commissioning]. Southern Metropolis Daily. Archived from the original on 2025-02-02. Retrieved 2025-06-24.
  6. ^ 李天研 (2024-08-29). "广州地铁十二号线新站命名,能否"复活"赤岗塔站?" [The naming of the new station on Guangzhou Metro Line 12, can it “revive” Chigang Pagoda Station?]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 2024-08-29. Retrieved 2025-06-24.
  7. ^ "关于地铁十二号线东段工程车站初定名称征求意见有关情况的说明" [Explanation on soliciting opinions on the preliminary names of stations for the East Section of Metro Line 12] (PDF). Guangzhou Civil Affairs Bureau (in Simplified Chinese). 2024-10-08. Archived from the original on 2024-10-08. Retrieved 2025-06-24.
  8. ^ "广州市民政局地名公告(20250422)" [Guangzhou Civil Affairs Bureau Place Name Announcement (20250422)]. Guangzhou Civil Affairs Bureau (in Simplified Chinese). 2025-04-23. Archived from the original on 2025-04-24. Retrieved 2025-06-24.
[edit]